Shanghai Petrochemical Wastewater Advanced Treatment and Reuse Facility (MBR System)
Project Name: Shanghai Petrochemical Wastewater Advanced Treatment and Reuse Facility (MBR System)
Treatment capacity: 1000 m 3/h
Operation time: January 2015
Treatment process: A/O+MBR
General introduction:
This is the advanced wastewater treatment and reuse system for Phase II of Shanghai Petrochemical Company, specifically the MBR system. The feed water consists of treated effluent from the existing oily wastewater treatment unit and pre-treated water from the southern system. The effluent from the MBR system will be reused as circulating cooling water.

Next page