博大环保 博大环保

Product Center

Number of views:
1000

Name:
Tiantang River recycled water treatment plant project in Daxing district, Beijing City

Overview: 8×104m3/d, the first stage of modification scale is 2.5×104m3/d, the treatment process is” biochemistry + sediment + Immersion UF membrane system”
Keywords:MunicipalTiantang River recycled water treatment plant project in Daxing district, Beijing City
Message
Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Quantity
-
+
Stock:
Product Details
Parameters

Project Name: Tiantang River recycled water treatment plant project in Daxing district, Beijing City

Treatment capacity: 25000m3/d

Operation time: 2016

Total Capacity: 8×104m3/d, the first stage of modification scale is 2.5×104m3/d, the treatment process is” biochemistry + sediment + Immersion UF membrane system”; the second stage of modification scale is 5.5×104m3/d, the treatment adopt MBR process.

Treatment process: Immersion UF membrane system

Keyword:
treatment
the
104m3
is
membrane
project
scale
capacity
uf
Scan the QR code to read on your phone
We could not find any corresponding parameters, please add them to the properties table

Copyright © 2021 Jiangsu Boda Environmental Protection Co.,Ltd.  All Rights Reserved.    Powered by www.300.cn   苏ICP备10210614号

Search

Boda