Tiantang River Recycled Water Treatment Plant Project in Daxing District, Beijing
Project Name: Tiantang River Recycled Water Treatment Plant Project in Daxing District, Beijing
Treatment capacity: 25,000 m 3/d
Operation time: 2016
Total capacity: 8 × 10^4 m³/d; the first-phase modification scale is 2.5 × 10^4 m³/d, with a treatment process comprising biochemical treatment, sedimentation, and an immersed UF membrane system; the second-phase modification scale is 5.5 × 10^4 m³/d, employing an MBR process.
Treatment process: Immersion UF membrane system
Previous Page
Next page
Previous Page
Next page